SEC Appeal Hearing (Contested Case - NAC 445B.875)
First Liberty Power Corp., Fencemaker Project
Mining - Water Pollution Control Discharge Permit NEV2009104

A three-member panel of the State Environmental Commission (SEC) will conduct an appeal hearing on the above referenced permit on November 14, 2016 in Carson City, Nevada at the Bryan Building, 901 South Stewart St., 2nd floor Tahoe Conference Room.

About the Project — The Fencemaker facility is located on public land in Pershing County, Nevada, within Section 10, Township 26 North, Range 37 East, Mount Diablo Baseline and Meridian, approximately 49 miles southeast of the town of Lovelock.

The Nevada Division of Environmental Protection (NDEP) originally issued Water Pollution Control Permit NEV2009104 to Stockpile Reserves, Inc. in September of 2009. On June 23, 2016, NDEP reissued the discharge permit to First Liberty Power Corp. Permit NEV2009104 authorizes the permittee to construct, operate and close the Fencemaker Project. The permit authorizes the extraction of up to 36,500 tons of ore per year.


About the Appeal — On June 15, 2016, a request for an appeal hearing was submitted to the State Environmental Commission (SEC) signed by Mr. Steve Vogel. On September 30 a revised request for an appeal hearing was submitted.

In summary, Mr. Vogel alleges that the NDEP Water Pollution Control permit issued to First Liberty Power Corp. was affected by error of law. Specifically, Mr. Vogel alleges that First Liberty Power Corp. does not have the appropriate mineral rights or business license to be the lawful permittee for discharge permit NEV2009104.

Appeal Documents


Site Index
SEC Home
Commission Roster | Scheduled Hearings | Hearings Records by Date
Rule Making | Appeals | Forms | Authorities
Commission History | Hearing Archives

DCNR Home | NDEP Home

   John B. Walker